Governor Mario M. Cuomo Bridge

Governor Mario M. Cuomo Bridge

Client: New York State Thruway Authority

Location: Hudson River North of New York City, NY, U.S.


Business Segment: Urban Solutions

Industry: Infrastructure

Map showing the location of Governor Mario M. Cuomo Bridge

Executive Summary


The Governor Mario M. Cuomo Bridge was designed and built by Tappan Zee Constructors, LLC (TZC), a consortium of some of the world's best-known and most highly-regarded design, engineering and construction firms, including Fluor, American Bridge, Granite and Traylor Bros., along with key design firms HDR, Buckland & Taylor, URS and GZA.

TZC worked closely on the project with a team of employees from the New York State Thruway Authority. The 3-mile twin span cable-stayed bridge is the single largest bridge construction project in New York's history and one of the largest single design-build contracts for a transportation project in the United States. The bridge replaced the Governor Malcolm Wilson Tappan Zee Bridge that connected Rockland County to Westchester County over the Hudson River.

Client's Challenge


The Governor Mario M. Cuomo Bridge was needed because the number of vehicles crossing the bridge every day far exceeded the number the previous bridge was designed to handle, traffic jams and delays were a regular occurrence, accident rates were high and maintenance costs on the old bridge were expected to be three to four billion dollars over the next 20 years. The bridge carried 140,000 vehicles daily. Approximately 50 million vehicles crossed the Tappan Zee Bridge in 2016.

The new bridge was designed and constructed to last 100 years without major structural maintenance. It is a visually striking, recognizable landmark and one of the widest cable-stayed structures of its kind in the world.

The Governor Mario M. Cuomo Bridge features eight general traffic lanes, four emergency shoulders, dedicated bus lanes, a shared bicycle/pedestrian path and a state-of-the-art traffic monitoring system. The new crossing also has the structural capacity to handle rail in the future.

Fluor's Solution


TZC was a strategically formed consortium of design-builders created to deliver the best project team to successfully build the Governor Mario M. Cuomo Bridge on time and within budget while achieving the highest environmental standards.

The TZC team partnership was based on aligning cultures within each firm that steered the strategic planning throughout the project. These key cultures shared by the team started with a no-nonsense outlook on safety.

TZC team members all shared excellent safety records and invested great resources and planning to ensure that each employee was trained and prepared to work in a safe environment.

The contract required, and TZC set aside, 10% of the total project budget as the Disadvantaged Business Enterprise (DBE) goal, which equated to about $314 million in subcontract opportunities. DBEs were encouraged to attend TZC's monthly orientation meetings, where they met with DBE program and procurement team members.

Conclusion


Construction began in late 2013. The first span opened to drivers in August 2017, shifting all four westbound lanes of traffic from the existing bridge. The second span opened in September 2018.

The Governor Mario M. Cuomo Bridge is one of the largest single design-build contracts for a transportation project in the United States and is the largest bridge in New York State history. The National Steel Bridge Alliance recognized the project team with its 2020 Prize Bridge Award in the Major Span category.

The project also earned an American Society of Civil Engineers 2021 Outstanding Civil Engineering Achievement Bronze Award for originality and innovation, resourcefulness in planning and solving design challenges, sustainability considerations and project planning and delivery.

Photos Courtesy New York State Thruway Authority.

Installing the framework for Pier 39 columns
Installing the framework for Pier 39 columns
1 / 17
Installing the framework for Pier 39 columns
Aerial view of bridge construction
Aerial view of bridge construction
2 / 17
Aerial view of bridge construction
Westbound span prepared to open to traffic
Westbound span prepared to open to traffic
3 / 17
Westbound span prepared to open to traffic
Workers inspect the main span's stay cables
Workers inspect the main span's stay cables
4 / 17
Workers inspect the main span's stay cables
Project team tests the westbound span aesthetic lighting
Project team tests the westbound span aesthetic lighting
5 / 17
Project team tests the westbound span aesthetic lighting
Eastbound span nearing connection to Westchester landing
Eastbound span nearing connection to Westchester landing
6 / 17
Eastbound span nearing connection to Westchester landing
Work near the Westchester landing
Work near the Westchester landing
7 / 17
Work near the Westchester landing
The I Lift NY super crane is taller than a 30-story building and can lift up to 1,900 tons.
The I Lift NY super crane is taller than a 30-story building and can lift up to 1,900 tons.
8 / 17
The I Lift NY super crane is taller than a 30-story building and can lift up to 1,900 tons.
I Lift NY super crane places 1,100-ton girders, reducing construction time on the river and creating a safer work environment.
I Lift NY super crane places 1,100-ton girders, reducing construction time on the river and creating a safer work environment.
9 / 17
I Lift NY super crane places 1,100-ton girders, reducing construction time on the river and creating a safer work environment.
The I Lift NY super crane places an assembly of girders for the westbound span.
The I Lift NY super crane places an assembly of girders for the westbound span.
10 / 17
The I Lift NY super crane places an assembly of girders for the westbound span.
Four towers will be constructed on this football-field-length main span pile cap.
Four towers will be constructed on this football-field-length main span pile cap.
11 / 17
Four towers will be constructed on this football-field-length main span pile cap.
Tower cranes assist with the construction of the bridge's iconic towers.
Tower cranes assist with the construction of the bridge's iconic towers.
12 / 17
Tower cranes assist with the construction of the bridge's iconic towers.
Construction begins on the new bridge's 419-foot towers atop the main span foundations.
Construction begins on the new bridge's 419-foot towers atop the main span foundations.
13 / 17
Construction begins on the new bridge's 419-foot towers atop the main span foundations.
An aerial view of the Rockland landing.
An aerial view of the Rockland landing.
14 / 17
An aerial view of the Rockland landing.
The new bridge's 419-foot towers begin construction on football-field-length foundations.
The new bridge's 419-foot towers begin construction on football-field-length foundations.
15 / 17
The new bridge's 419-foot towers begin construction on football-field-length foundations.
An ironworker helps connect the final westbound girder assembly.
An ironworker helps connect the final westbound girder assembly.
16 / 17
An ironworker helps connect the final westbound girder assembly.
I Lift NY crane on its way up the Hudson River to the project site
I Lift NY crane on its way up the Hudson River to the project site
17 / 17
I Lift NY crane on its way up the Hudson River to the project site